the last few weeks have seen unprecedented progress to the life of the condo.

we have laid down 90% of the door casing and base-board moulding in the

downstairs.  only lacking some peices in the kitchen and a few headers on

doors and we’ll be finished with the hanging part.  next will be putty, sand, paint.

but at least we are no longer providing wee critters from black-ops infiltrating

our much-warmer-than-outside abode.  i don’t have pics yet ’cause some of

my corners are horrible.  but will post some soon.  like, before MAY at least.

in the mean-time, here’s a photo erin took when we were in new york this fall.

west point.

still alive… December 28. 2007

Posted by bnepro in bne.
Tags: , ,
add a comment

hey everyone. things are progressing slowly @ the new condo.

life has a way of happening…

i’ve recently added some renderings and such to a ‘gallery‘ page

which you can access by clicking on the bne logo on the ‘services‘.

ok October 4. 2007

Posted by bnepro in home improvement.
add a comment

right.

i don’t post anymore.

i really appreciate you folks that have been

looking on the site to see if anything has

happened in the near-distant past. but

little-to-nothing has.

we took a little vakay to NY recently

with mom and step-dad.

fantastic time, and i’ll be posting pics

shortly. as soon as i get them to a web-managable

size.  but it might be a little while before that

actually happens as i have become a bit lazy

of late.

here’s an image to keep you placated…ground 0

goin’ stag. September 18. 2007

Posted by bnepro in home improvement.
add a comment

stagnation that is.

this past week has been fantastic.

got to see the bros for a few days.

got to watch some college football.

got to see a 7 point lead get erased by

total idiocy and bad play-calling and

lack of secondary…

and to accompany all of the visitations (of bad spirits)

with the brothers and such we haven’t done a DANG

thing on the house save some laundry in the last week.

but today i think i’ll add some doors to the mix.

nothing like having your mom and da stay over without

doors on the bedroom their going to be sleeping in, or the

bath that everyone has to use…yeah…i’m not embellishing

any of that.

but i’ll leave you with a little travellin’ music.

sorry it’s not US making this hit.

long time, no post September 11. 2007

Posted by bnepro in home improvement.
add a comment

sorry i haven’t posted in forever.

having said that, this week will prove to be post-worthy

in many respects as we are going to finish the bathroom

(finally) and hang some doors.

i know what you’re thinking, what did the doors ever do?

well those doors deserve it, no matter what you may think,

and we’re going to all stand around and laugh as we let

those rotten doors dangle on their hinges like the naughty

doors that they are.

also this week we have family descending upon NWA.

brothers and brothers’ friends will all be here for the

big 20-year reunion.  in fact, i probably won’t even see

the brothers for more than about 2 hours of the near-week

that they will be here because of said reunion.  but it should

make for interesting photo-graffy and stories.

when i get the bath done and the doors hanged i shall

post again, but right now i’m still reeling from the

big monday night football double-dose last night.

first game: definitely worthy of MNF

second game: lamentable at best.  and i’m still

wondering why i stayed up so late to watch it.

matt lienert my a$$.  what a waste of time.

at least when you watch arkansas players in the

NFL they perform.  sunday night kenny hamlin

was all over the place, got 7 tackles.  jamaal anderson…

well, sorry about the loss, baby, but got some sweet

pre-season action and some sacks.  i don’t know

what to say about matty…practice harder(?),

take that spot from jones-drew(?).  but the point

is that lienert was supposed to be the next freakin’

brett favre or something like that.  and last night

was just sad.

enough about football.

more posts this week.

Hogs @ bama on saturday…
GO HOGS!

‘code for what?…’ August 28. 2007

Posted by bnepro in home improvement.
add a comment

i have a new name for the ‘worst character ever’

and it’s not ‘towlie‘, it’s TILE-Y.

i think i threw down a few pix of the tile in the

master bath just before i had actually done the

grout…

let’s all think about that word…’grout’.

it’s almost offensive.

it sounds dirty.

hell, it sounds like some sort of CONDITION.

‘hey man, you’re not lookin’ too well, everything ok?’

‘nah, man i got the GROUT. it’s tearin’ me up.’

‘duuude, sorry, yo.’

well, when we did the grout (eeeeeuw)

in the master bath i ran out of one kind and

in my haste ran to the store, grabbed a thing of

white tile grout, unsanded‘ and went back to work.

well the stuff i got was ass. (sorry mom)

it was more like a tub of ‘tub and tile caulk’.

totally vinyl, still pliable (two weeks later).

so tonight i am getting rid of it.

here are some smashing pix of the work.

grout removal

it’s not obvious from the pic how different

the old (good) grout and the different (crappy)

grout looks and performs, well here’s a better

view : good vs. evil

and if you ever have to do this little task,

don’t go and buy the $10.00 tool to the left,

(and i know most of you are pretty familiar with tools)

use your 5-way. it’s only about 10,000%

more effective.

tools of the trade

complete kitchen August 25. 2007

Posted by bnepro in home improvement.
1 comment so far

almost there on the kitchen.

last night we put the remainder of the

shelving up and erin got after arranging

all of the dishes and such.

i promised pix. and pix i shall deliver.

kitchen cabs 1

kitchen cabs 2

and here’s a bit of a close-up of the bracket we went with.

kitchen cabs close-up

now if we can get the hood up, this little portion of

the project can be wrapped.

no…not ‘rapped‘.

finishing the last few tiles in the master

bath is next on my agenda, and i better

get started.

post toasties August 23. 2007

Posted by bnepro in home improvement.
add a comment

more like ‘post ghosties’.

you old-school MAD readers will ‘get’ that last.

sorry i haven’t posted in a while,

we are still making progress but since it all seems

to look too similar the photos have been lax.

the upstairs bath is just about finished,

we only lack the shower curtain to make it

fully-functional.  the downstairs is slowly

becoming clear of clutter and tools.

we are going to put the shelves up in the

kitchen tonight so i’ll be sure and get some

pics of that to show everyone.

we also installed a new light over the dining

room table area.

then we installed another light over the dining

room table area.  moved the previously-installed

fixture to the foyer which i will hook up tonight.

soon we are going to get some help on cabinetry

from one of our family’s old friends/acquaintances,

the venerable SMG Alan Dunn.  also known as

‘the best damn carpenter EVER’.  the SMG has

more tools than a NASCAR race and could make

a board look like a sheepshank.  we’re hoping to hire

him to do the AV wall cabs and another piece in the

bedroom where the olde vanity was (in the bedroom).

In the BEDROOM!?  what is this a freakin’ hotel.

scratch that.  more like a MOtel!….

vanity in the bedroom…gimme a break.

something to say August 18. 2007

Posted by bnepro in home improvement.
1 comment so far

ok,

i haven’t posted in forever and it will

seem like there’s little to even report.

but we’ve gotten moved in,

everything in storage is now in the haus.

i won’t bore you with details of the move

save this: two hours 15 minutes.

i’d like to thank the academy-

wait, no… i’d like to thank dr. amanda keen-zeebert

and her husband konah. cheryl hughes and her sister

my an-brenna. u-haul and so on. it went swiftly and

was relatively painless.

and since we’ve managed a few things.

here is what i did today.

mbbath 2

mb bath 3

and here’s what the kitch looks like since finish-time:

new kitch

new kitch 2

and hopefully the bath will turn out well…

mb bath

we shall see.

’slow going…?’ August 9. 2007

Posted by bnepro in home improvement.
add a comment

‘look this is not as easy as it looks.

so if you don’t mind not distracting me?’

yes, i’m busy

this last week we have been working on kitchen

cabs and have gotten the floor upstairs near-to-finished.

master bed new floor II

it was 100+ degrees today and i spent a good portion

of the afternoon with a worm-drive circular saw

in one hand, and a tape in the other, with a

carpenter’s pencil crammed in my visor…

it was a bit humid.

i was a bit swarthy.

hell i was really swarthy: i went through about

a gallon of water in two hours.

i think it straight-up went from jug,

to mouth,

to shirt.

but we did manage to get the wood down and

tonight erin got the sealer on so tomorrow it’s

polyurethane and finish the kitchen sink.

sink prep